EssayBang

為您留學生活排憂解難

代寫essay-assignment-留學生論文網課代上代修-HPessay

代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

V:essayok
EssayHP
留學生代寫為你提供最好的essay代寫服務。
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
1
INTERPRETATIVE REPORT
Each student shall prepare an interpretative report on a site investigation for the reservoir and
associated structures, as shown on drawing ‘Site Plan’. The aims of this report are to outline the
structural properties of the site in relation to the proposed development, carry out initial design
calculations for the proposed work, advise on any problems that may occur on the site during and
(or) after construction and suggest justifiable ways of overcoming any problems identified.
Using the parameters given each student must individually complete the following sections:
1. Laboratory report: using the parameters obtained in the laboratory each student must
individually prepare a report (see Laboratory Reports sheet), which should include a copy of the
relevant British Standard for testing, and a full set of test results, which shall include all
calculations. It would be appropriate to undertake the calculations using a spreadsheet. A part of
this report shall include detailed comments on the use of the tests undertaken and the conformity
of the material tested to appropriate specifications used in geotechnical engineering.
2. Interpretative report - the presentation of the report must be to a very high and accurate
standard i.e. you are employed by the client to produce a series of professional design
calculations – marks will be deducted if this is not achieved.
3. Strata Conditions – comment on how the strata profiles/conditions would have been obtained
(types of site investigation) and summarise the strata conditions for the proposed development –
produce a plan and cross sections of strata conditions - include the angle of dip and strike lines.
4. Earth Filled Dam – design & stability; flow through and beneath the dam; design check for
piping.
5. Slope stability – the stability of the reservoir’s slopes; the stability of the dam (up/down
stream) – reservoir empty/full/rapid draw down (effective and total stress parameters – bulk, dry
and saturated unit weights)
6. Spillways – foundation design and settlement analysis – find a suitable pad foundation for the
spillway; consider the settlement.
7. Pump House – design, bearing capacity and settlement; the structure of the pump house is
considered to impose a 40 kN/m 2 on a raft foundation 32m by 18m.
8. Retaining Wall – a retaining wall is required to the northern boundary of the pump house site –
there are several types of retaining walls – consider which type of wall will be the most
suitable – design the wall.
The marking scheme:
Subject / Comments
Marks
1)  Laboratory report  30
Interpretative report:
2)  Report Format (including references, etc)  10
3)  Strata Conditions  10
4)  Earth filled Dam  10
5)  Slope stability  10
6)  Spillways  10
7)  Pumphouse  10
8)  Retaining Wall  10
Total  100%
Late Submission
Mark Awarded
Justifiable assumptions
can be made on any
part of the design if
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT
relevant data has not
been given, if any
further investigation is
required this should be
noted – the use of both
hand calculations and
computer analysis
should be used in the
design.
LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
2
1. STRATA PROFILES
Borehole 1
GL - 0.2m  Topsoil
0.2m - 4.8m  Brown fissured silty CLAY
4.8m – 10.5m  Dark grey silty CLAY
10.5m – 16.3m  Yellow brown silty fine SAND
16.3m - 25.0m  Dark grey silty CLAY
Borehole 2
GL - 0.3m  Topsoil
0.3m – 5.1m  Brown fissured silty CLAY
5.1m – 13.0m  Dark grey silty CLAY
13.0m – 18.8m  Yellow brown silty fine SAND
18.8m - 25.0m  Dark grey silty CLAY
Borehole 3
GL - 0.2m  Topsoil
0.2m – 5.3m  Brown fissured silty CLAY
5.3 m – 7.8m  Dark grey silty CLAY
7.8m – 13.6m Yellow brown silty fine SAND
13.6m - 25.0m  Dark grey silty CLAY
2. STRATA CONDITIONS
Brown fissured silty CLAY  ? ?? ?
? b 20.8 kN/m 3
? d 16.2 kN/m 3
C u 45 kN/m 2 ? u 11 o
C’  6 kN/m 2 ?’  23 o
m v 0.25m 2 /MN  C v 4.26x10 -6 m 2 /s
k 3.8x10 -8 m/s  LL = 58%, PL = 26%
Particle Density 2.50
Dark grey silty CLAY
? b 19.2 kN/m 3
? d 13.3 kN/m 3
C u 70 kN/m 2 ? u 2 o
C’  5 kN/m 2 ?’  28 o
m v 0.81m 2 /MN  C v 5.3x10 -7 m 2 /s
k 3.8x10 -8 m/s  LL = 82%, PL = 47%
Particle Density 2.65
LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
3
Yellow brown fine SAND
?  17 kN/m 3
SPT ‘N’  35 blows/300mm
CBR 19%
m v 0.09m 2 /MN
k  2.88x10 -3 m/sec
Particle Density 2.62
Considerations should be given to the water table being well below ground level and at ground level.
3. EARTH FILL DAM
Earth fill comprising brown slightly sandy silty CLAY
? b 18 kN/m 3  ? b 14 kN/m 3
C u 140 kN/m 2 ?  0 o
C’  5 kN/m 2 ?’  28 o
m v 0.14m 2 /MN
k  3.8x10 -8 m/sec
The submission of the laboratory report & Interpretative report: 10 th September 2015. Normal
University rules regarding late submission shall apply.
CLAY
0.5m
13m
34m
8m
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

編輯團隊由海歸留學生,英語專八畢業生及相關專業寫手組成,旨在為您提供高品質的代寫服務。

EssayBang

代寫essay-assignment-留學生論文網課代上代修-HPessay

代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

V:essayok
EssayHP
EssayHP為你提供最好的essay代寫服務。
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
1
INTERPRETATIVE REPORT
Each student shall prepare an interpretative report on a site investigation for the reservoir and
associated structures, as shown on drawing ‘Site Plan’. The aims of this report are to outline the
structural properties of the site in relation to the proposed development, carry out initial design
calculations for the proposed work, advise on any problems that may occur on the site during and
(or) after construction and suggest justifiable ways of overcoming any problems identified.
Using the parameters given each student must individually complete the following sections:
1. Laboratory report: using the parameters obtained in the laboratory each student must
individually prepare a report (see Laboratory Reports sheet), which should include a copy of the
relevant British Standard for testing, and a full set of test results, which shall include all
calculations. It would be appropriate to undertake the calculations using a spreadsheet. A part of
this report shall include detailed comments on the use of the tests undertaken and the conformity
of the material tested to appropriate specifications used in geotechnical engineering.
2. Interpretative report - the presentation of the report must be to a very high and accurate
standard i.e. you are employed by the client to produce a series of professional design
calculations – marks will be deducted if this is not achieved.
3. Strata Conditions – comment on how the strata profiles/conditions would have been obtained
(types of site investigation) and summarise the strata conditions for the proposed development –
produce a plan and cross sections of strata conditions - include the angle of dip and strike lines.
4. Earth Filled Dam – design & stability; flow through and beneath the dam; design check for
piping.
5. Slope stability – the stability of the reservoir’s slopes; the stability of the dam (up/down
stream) – reservoir empty/full/rapid draw down (effective and total stress parameters – bulk, dry
and saturated unit weights)
6. Spillways – foundation design and settlement analysis – find a suitable pad foundation for the
spillway; consider the settlement.
7. Pump House – design, bearing capacity and settlement; the structure of the pump house is
considered to impose a 40 kN/m 2 on a raft foundation 32m by 18m.
8. Retaining Wall – a retaining wall is required to the northern boundary of the pump house site –
there are several types of retaining walls – consider which type of wall will be the most
suitable – design the wall.
The marking scheme:
Subject / Comments
Marks
1)  Laboratory report  30
Interpretative report:
2)  Report Format (including references, etc)  10
3)  Strata Conditions  10
4)  Earth filled Dam  10
5)  Slope stability  10
6)  Spillways  10
7)  Pumphouse  10
8)  Retaining Wall  10
Total  100%
Late Submission
Mark Awarded
Justifiable assumptions
can be made on any
part of the design if
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT
relevant data has not
been given, if any
further investigation is
required this should be
noted – the use of both
hand calculations and
computer analysis
should be used in the
design.
LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
2
1. STRATA PROFILES
Borehole 1
GL - 0.2m  Topsoil
0.2m - 4.8m  Brown fissured silty CLAY
4.8m – 10.5m  Dark grey silty CLAY
10.5m – 16.3m  Yellow brown silty fine SAND
16.3m - 25.0m  Dark grey silty CLAY
Borehole 2
GL - 0.3m  Topsoil
0.3m – 5.1m  Brown fissured silty CLAY
5.1m – 13.0m  Dark grey silty CLAY
13.0m – 18.8m  Yellow brown silty fine SAND
18.8m - 25.0m  Dark grey silty CLAY
Borehole 3
GL - 0.2m  Topsoil
0.2m – 5.3m  Brown fissured silty CLAY
5.3 m – 7.8m  Dark grey silty CLAY
7.8m – 13.6m Yellow brown silty fine SAND
13.6m - 25.0m  Dark grey silty CLAY
2. STRATA CONDITIONS
Brown fissured silty CLAY  ? ?? ?
? b 20.8 kN/m 3
? d 16.2 kN/m 3
C u 45 kN/m 2 ? u 11 o
C’  6 kN/m 2 ?’  23 o
m v 0.25m 2 /MN  C v 4.26x10 -6 m 2 /s
k 3.8x10 -8 m/s  LL = 58%, PL = 26%
Particle Density 2.50
Dark grey silty CLAY
? b 19.2 kN/m 3
? d 13.3 kN/m 3
C u 70 kN/m 2 ? u 2 o
C’  5 kN/m 2 ?’  28 o
m v 0.81m 2 /MN  C v 5.3x10 -7 m 2 /s
k 3.8x10 -8 m/s  LL = 82%, PL = 47%
Particle Density 2.65
LEEDS METROPOLITAN UNIVERSITY
BUILT ENVIRONMENT MODULAR SCHEME
GEOTECHNICAL ENGINEERING B
3
Yellow brown fine SAND
?  17 kN/m 3
SPT ‘N’  35 blows/300mm
CBR 19%
m v 0.09m 2 /MN
k  2.88x10 -3 m/sec
Particle Density 2.62
Considerations should be given to the water table being well below ground level and at ground level.
3. EARTH FILL DAM
Earth fill comprising brown slightly sandy silty CLAY
? b 18 kN/m 3  ? b 14 kN/m 3
C u 140 kN/m 2 ?  0 o
C’  5 kN/m 2 ?’  28 o
m v 0.14m 2 /MN
k  3.8x10 -8 m/sec
The submission of the laboratory report & Interpretative report: 10 th September 2015. Normal
University rules regarding late submission shall apply.
CLAY
0.5m
13m
34m
8m
代寫 GEOTECHNICAL ENGINEERING INTERPRETATIVE REPORT

編輯團隊由海歸留學生,英語專八畢業生及相關專業寫手組成,旨在為您提供高品質的代寫服務。

在線客服

售前咨詢
售后咨詢
微信號
Essay_Cheery
微信
北美代写,美国作业代写,网课代修,Assignment代写-100%原创 北美作业代写,【essay代写】,作业【assignment代写】,网课代上代考 英国作业代写,代写英文,英文论文润色代考价格-论文代写高质量平台 essay代写,英文论文代写,网课代修-地表最专业的留学生代写平台 英国作业代写,✔美国代考,【assignment代写】,business代写 北美 论文代写,金融代写,Assignment代写,英文论文润色-100%原创 作业代写,伦敦代写,澳洲代写assignment,,统计代写【包过】 代写被抓,英国代写,,CS作业代写,python代写,美国代写被抓怎么办? Essay代写,澳洲essay代写价格,网课代修,准时✔️高质数学代写 Essay代写,代写作业,网课代修代做-地表最专业的留学生代写机构